Status Of RMS and Spot Billing

 

 

RMS Software is developed by CBG Jabalpur and all the implementation is planned and decided by them. This company is fully dependent on CBG for implementation. The Parallel Run of RMS at Jabalpur East Division started in Jan 04. The new version is loaded there after modifications and parallel run is still being continued in the month of April 04. It is planned that once Jabalpur East Division goes live all the 5 city divisions of Company will be taken up for parallel run and balance 2 O&M divisions will be taken in the subsequent month.

 

Present Status

 

         Server room for four City Divisions had setup with required Electrical and Civil work.

 

         Servers of four City Divisions and one O&M Dn is installed at server room and required software loaded on these machines

 

         Temporary LAN was initially setup with 25 computers.

 

         Data entry started with engaging out-sourced agency.

 

         Temporary LAN extended to 35 computers to speed up data entry work.

         Version 1.1.2 of RMS loaded on 7 servers and data entry for the balance consumers in progress planned to be finished by 15th May 04

 

 

Progress of Data Entry             

 (City Circle Indore)

         Data entry of four City Divisions is done for

Ø      33/11 KV Transformers                 68 Nos

Ø      11 KV Feeders                            136 Nos

Ø      11 KV Poles                            13313 Nos

Ø      Distribution Transformers         3265 Nos

Ø      L T Poles                                 46512 Nos

Ø      Consumers                            313361 Nos

          100% Data entry up to consumer level is completed on 30 Aug 03.

 

 

 (O&M Division Indore)

         Data entry of O&M Division is done for

Ø      33/11 KV Transformers                50 Nos

Ø      11 KV Feeders                           100 Nos 

Ø      11 KV Poles                           15189 Nos

Ø      Distribution Transformers         2237 Nos

Ø      L T Poles                                42956 Nos                  

          100% Data entry up to LT Poles level is completed on 30 Aug 03.

 

 (Ujjain City Circle)

         Data entry of Ujjain City Circle is done for

Ø      33/11 KV Transformers                18 Nos

Ø      11 KV Feeders                             47 Nos 

Ø      11 KV Poles                             4403 Nos

Ø      Distribution Transformers          855 Nos

Ø      L T Poles                                21975 Nos

Ø      Consumers                              88175 Nos                  

          100% Data entry up to Consumer level is completed on 30 Aug 03.

 

 (O&M Division Ujjain)

         Data entry of O&M Division Ujjain is done for

Ø      33/11 KV Transformers                28 Nos

Ø      11 KV Feeders                             53 Nos 

Ø      11 KV Poles                             2020 Nos

Ø      Distribution Transformers         2237 Nos

Ø      L T Poles                                42956 Nos                  

          100% Data entry up to LT Poles level is completed on 30 Aug 03.

 

 

 

 

 

 

 

Hardware Required in RMS
(For Priority Divisions)

 

         Hardware Required in RMS for Priority Divisions( 4 City and 1 O&M Division of Indore) :

 

Particulars

Total Reqired

Available

Shortfall

Servers

10

10

0

PC P-IV

234

172

62

DMPrinter(132C)

101

41

60

DMPrinter (80C)

62

28

34

 

         Hardware Required in RMS for Priority Divisions( City and O&M Divisions Ujjain) :

 

Particulars

Total Reqired

Available

Shortfall

Servers

4

4

0

PC P-IV

79

42

37

DMPrinter(132C)

30

15

15

DMPrinter (80C)

21

11

10

 

Bottlenecks

 

         Following support were needed from CBG during data entry process

Ø      Conversion of latest bill file data for city Circle Indore, check for the changes occurred after December 02 and their listing.

Ø      Report generation of 11 KV and LT Poles for O&M division.

Ø      Modification permissions for O&M divisions.

Ø      A provision for transferring last six readings of the consumers from the existing LT Billing system as these readings are to be displayed in the revised bill forms.

 

On Spot Billing

 

On spot billing will start with the rollout of RMS initially in priority division and later on in other divisions as and when the RMS billing is started which is being finalized by CBG form Jabalpur